TC8/SC1 Static volume and mass measurement
BIML Contact
Secretariat
-
UNITED STATESDr Katya DELAK
Participating Members (25)
- AUSTRALIA
- AUSTRIA
- BELGIUM
- CUBA
- CZECHIA
- FRANCE
- GERMANY
- INDIA
- IRAN
- JAPAN
- KOREA (R.)
- NETHERLANDS
- P.R. CHINA
- POLAND
- ROMANIA
- RUSSIAN FEDERATION
- SERBIA
- SLOVAKIA
- SLOVENIA
- SOUTH AFRICA
- SWEDEN
- SWITZERLAND
- TÜRKIYE
- UKRAINE
- UNITED STATES
Observer Members (11)
Organisations in Liaison
- CECOD Committee of European Manufacturers of Petroleum Measuring and Distributing Equipment
- CEN European Committee for Standardization
- ISO International Organization for Standardization
- MARCOGAZ Technical Association of the European Natural Gas Industry
- WELMEC European Cooperation in Legal Metrology
Responsible for
- R 71:2008(en) Fixed storage tanks. General requirements
- R 80:2017(en) Road and rail tankers with level gauging
- R 85:2008(en) Automatic level gauges for measuring the level of liquid in stationary storage tanks
- R 95:1990(en) Ships' tanks - General requirements
- R 125:1998(en) Measuring systems for the mass of liquids in tanks
Projects
- p 5 Revision of R 95: Ships' tanks - General requirements
- Proposal phase: Project Approved; project group forming - 2000-01-01
- Cancellation proposed to CIML due to lack of demand and interest
- p 9 Revision of R 71: Fixed storage tanks. General requirements
- PG phase: 1 CD circulated to PG for comment - 2016-03-02
- New conveners May 2025. Plan for progress expected soon
- p 10 Revision of R 85: Automatic level gauges for measuring the level of liquid in stationary storage tanks
- PG phase: 1 CD circulated to PG for comment - 2016-03-02
- New conveners May 2025. Plan for progress expected soon
- p 11 Revision of R 125: Measuring systems for the mass of liquids in tanks
- Proposal phase: Project Approved; project group forming - 2016-11-03
- Cancellation proposed to CIML due to lack of demand and interest
- p 12 New Guide - Fixed storage and transportable tanks. Calibration using electro-optical distance-ranging method
- PG phase: Project group started - 2025-11-01